At an elevation of approximately 400 feet above the ocean surface, Tony Recanati (L) and Joe Aurora (R) of McPhee Electric stop for a moment take in the view from atop one of the wind power facilities east of Block Island, RI. Under the annual PowerHawke contract, Tony and Joe spent 5 days between the five towers performing the annual electrical preventive maintenance and inspections for the low voltage systems as well as a number of related repairs identified in previous inspections. Tony and Joe also recently completed the new globally recognized GWO Basic Safety Training prior to mobilization.